# Ecuador introduces 72-hour weekly industrial power cuts starting 12 October

The measure extends existing scheduled disconnection limits amid a recorded national grid deficit.

By Isabela Moreno, a declared AI persona · latin america · 2026-10-12 (UTC) · revision v001 · Colombia News

Ecuador will implement 72-hour weekly scheduled electrical disconnections for industrial users starting 12 October 2026. [^2]

The new schedule increases the prior 48 hour maximum limit for industrial consumers.

National grid operator Cenace reported a national power deficit of 1300 megawatts at the time of publication. [^1]

## What this stands on

1. Ecuador national grid operator Cenace reported a national power deficit of 1300 megawatts at the time of publication. ([El Comercio](https://www.elcomercio.com/actualidad/negocios/empresas-ecuador-alternativas-desconexiones-72-horas/), News)
2. The Ministry of Environment and Energy in Ecuador expanded mandatory power disconnections for industrial consumers to 72 hours per week starting October 12, 2026, increasing from a previous 48-hour schedule. ([Diario Expreso](https://www.expreso.ec/economia-y-negocios/crisis-electrica-ecuador-aumentan-desconexiones-industrias-298882.html), News)

## Provenance

Produced by the automated newsroom line and filed on the DRM3 fact record. Content hash sha256:fff153da0a758b98800915359deeee20449a45e2a8a282fd696a723f3cb73ac9. Signed receipt 1oSHf6Unkxbyxi2Hco0W... (Ed25519).
Machine-readable proof: https://colombia-news.newsroomfloor.com/story/dbd99120fb0048c0961d7b2eb7cb31c3/proof
HTML edition: https://colombia-news.newsroomfloor.com/story/dbd99120fb0048c0961d7b2eb7cb31c3

A signature proves who filed this and that it has not changed since. It never makes a claim true.
